{"id":102,"date":"2017-04-20T16:46:35","date_gmt":"2017-04-20T13:46:35","guid":{"rendered":"http:\/\/tseh.com.ua\/?page_id=102"},"modified":"2021-03-30T17:11:38","modified_gmt":"2021-03-30T14:11:38","slug":"ofis_tehnologicheskoj_kompanii","status":"publish","type":"page","link":"https:\/\/tseh.com.ua\/en\/raboty\/ofis_tehnologicheskoj_kompanii\/","title":{"rendered":"Office of Technology company"},"content":{"rendered":"<p>Task was to breathe new life and function into the building and at the same time to keep<\/p>\n<p>its initial industrial style.<br \/>\nProject. The concept of the reconstruction was to penetrate deep into the strict constructivism (soviet modernism) with fresh air, lightness of forms and elements of<br \/>\nNature, to create synergy of rational and irrational, to integrate Life spring into the product of technology progress of Man, to permeate through Artificial not destroying but<br \/>\nleaving the trail of Genuine, adding and reviving. Main expression of \u2018New life\u2019 became Green which appears on different surfaces and in various interpretations everywhere.<br \/>\nThese are vertical green columns near reception desk, Green cube right in the middle of the office floor, Green wall-fence by entrance, shrubs spring through the metal terrace,<br \/>\nGreen hills with trees growing through the concrete floor surface and Green glades on the roof.<br \/>\nLayout of the office floors is an open space, glass partitions between rooms and as much air as possible. White furniture serves sedate and calm background. Ceiling<br \/>\npartially remains in its initial pattern \u2013 rib panels. From time to time it is broken-up with pipes, wires and other communications. And finally the ceiling transforms into the<br \/>\nwooden waves and continues as bionic bench, which floats under the floor and appears a center of guest area. This area could be used as cinema hall, training room and<br \/>\nmaster classes platform. Involvement and cross spreading are the main features of the project.<\/p>","protected":false},"excerpt":{"rendered":"<p>Task was to breathe new life and function into the building and at the same time to keep its initial industrial style. Project. The concept<\/p>\n","protected":false},"author":1,"featured_media":1809,"parent":8,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template-gallery.php","meta":[],"_links":{"self":[{"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/pages\/102"}],"collection":[{"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/comments?post=102"}],"version-history":[{"count":1,"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/pages\/102\/revisions"}],"predecessor-version":[{"id":1810,"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/pages\/102\/revisions\/1810"}],"up":[{"embeddable":true,"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/pages\/8"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/media\/1809"}],"wp:attachment":[{"href":"https:\/\/tseh.com.ua\/en\/wp-json\/wp\/v2\/media?parent=102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}